Herdades da Figueira de Baixo e de Cima
Post
Published 01. Apr 2024 by fsottomayor1 in
Herdades da Figueira de Baixo e de Cima
Land Preparation

Land preparation began in March, aiming to ready 150 to 200 hectares before starting the construction of water dams in July. Our water engineers have introduced a study suggesting a more efficient utilization of the property's water resources during the dry season. We are currently collaborating with the dam engineers to enhance capacity at the existing three dams, with the potential to construct two more. Subsequently, irrigation engineers will devise a plan to irrigate 150 hectares of Cork Oak trees.